Search
JOIN OUR NETWORK

     

     

 

 

« Letter to the Editor: NRC's rules too weak at Davis-Besse | Main | Nuclear Licensing Board Examines Brittle Vessel Risks at Entergy’s Palisades Atomic Reactor; Critics Call for Permanent Shutdown »
Monday
Jun222015

Entergy's Palisades but the canary in the coal mine for age-degraded RPV risks

NRC file photo of Entergy Nuclear's Palisades atomic reactor, located on the Lake Michigan shoreline in Covert, MIA U.S. Nuclear Regulatory Commission (NRC) Atomic Safety and Licensing Board Panel (ASLBP) has granted an evidentiary hearing on the merits of concerns regarding the risks of a ductile tear, or fracture, of Entergy Nuclear's severely embrittled Palisades atomic reactor pressure vessel (RPV), located in Covert, MI on the Lake Michigan shore (see photo, left). Toledo-based attorney, Terry Lodge, filed the petition on behalf of an environmental coalition (Beyond Nuclear, Don't Waste MI, Michigan Safe Energy Future, and Nuclear Energy Information Service). Arnie Gundersen, Chief Engineer at Fairewinds Associates, Inc. in Burlington, Vermont, serves as the coalition's expert witness.

Although Entergy's Palisades has the worst embrittled RPV in the U.S., it is but the canary in the coal mine. As revealed in an April 2013 NRC document (see point #4, on page 5 of 15 on PDF counter), Next Era's (Florida Power & Light's) Point Beach Unit 2, also located on the Lake Michigan shore in Wisconsin, is nearly as bad. Following not very far behind in terms of RPV fracture risk are Entergy's Indian Point Unit 3 near New York City, Pacific Gas & Electric's Diablo Canyon on the California coast, and FirstEnergy's Beaver Valley Unit 1 in Shippingport, Pennsylvania. FirstEnergy has also been required to have an Aging Management Plan for RPV embrittlement at its Davis-Besse atomic reactor on the Lake Erie shore near Toledo, an indication that this is a serious concern there as well.

RPV age-related degradation was the top safety concern of a broad environmental and public interest coalition's efforts, from 2005 to 2007, to block Palisades' 20-year license extension. However, the NRC ASLBP overseeing that proceeding simply rubber-stamped Palisades' license extension application, as did the full NRC Commission. Intervenors' concerns were dismissed, based on mere legalistic technicalities. The ASLBP at the time chastised the intervening coalition, scolding them that NRC's intervention rules are "strict by design."

More.

Reader Comments

There are no comments for this journal entry. To create a new comment, use the form below.
Editor Permission Required
You must have editing permission for this entry in order to post comments.