Opponents to 20 More Years at Davis-Besse Challenge New Flaws: Renewables Cited as Inevitable Replacement
On Earth Day, 2014, opponents to 20 more years at Davis-Besse called for the problem-plagued atomic reactor to be shut down by Earth Day, 2017, or preferably earlier, before it melts down and its severely compromised containment releases catastrophic amounts of hazardous radioactivity downwind and downstream into the Great Lakes basin. Davis-Besse's 40-year license expires on April 22, 2017.
Citing renewable sources of electricity, such as wind power and solar photo-voltaics (PV), as ready replacements, a coalition of environmental groups, including Beyond Nuclear, filed comments by last night’s midnight deadline on the U.S. Nuclear Regulatory Commission’s (NRC) Draft Environmental Impact Statement (DEIS) regarding FirstEnergy Nuclear Operating Company’s (FENOC) proposed 20-year license extension.
At the same time, a coalition of official interveners resisting the license extension launched its latest salvo in the three-and-a-half-year-long NRC Atomic Safety and Licensing Board (ASLB) proceeding. The coalition is represented by Toledo attorney Terry Lodge (photo, left). The filing deadline was also April 21st -- 60 days after a Shield Building wall gap, and rebar damage, were officially reported by NRC.
The coalition issued a press release.
ASLB filing:
Exhibits: #1, NRC Preliminary Notice of Event or Occurrence (Feb. 19, 2014); #2, Toledo Blade article, “Davis-Besse Had Air Gap in Shield Building,” (Feb. 15, 2014); #3, Declaration of Victoria Clemons (April 14, 2014); #4, Minutes of Internal Meeting of Davis-Besse Oversight Panel (Oct. 18, 2001); #5, Minutes of Internal Meeting of Davis-Besse Oversight Panel (Oct. 29, 2002); #6, NRC Preliminary Notice of Event or Occurrence (Sept. 20, 2013); #7, NRC Request for Additional Information (April 15, 2014); #8, Expert Witness Report of Arnold Gundersen, 50-246-LA (2013).
DEIS comments:
1. Amory Lovins' "Nuclear power’s competitive landscape and climate opportunity cost," March 28, 2014 (TMI+35), Dartmouth College, NH
Amory Lovins on uncompetitiveness of old atomic reactors. At page 5 Lovin’s writes: "Reactors are promoted as costly to build but cheap to run. Yet as Daniel Allegretti ably described, many existing, long-paid-for U.S. reactors are now starting to be shut down because just their operating cost can no longer compete with wholesale power prices, typically depressed by gas-fired plants or windpower."
2. PJM Interconnect: 30% grid integration of renewables not a problem.
In fact, it was well known to PJM (Pennsylvania/Jersey/Maryland) Interconnect, covering 13 states and this nation's largest single electric grid, as published in this 2010 2010 ISO/RTO Metrics Report, posted at the website of the U.S. Federal Energy Regulatory Commission, that wind power and solar PV are available in abundance and that there is no disruption or destabilizing of "baseload grid" associated with their integration. Replacement power was available in 2010, and is available now, and certainly in 2017.
On Dec. 27, 2010, the environmental coalition -- with University of Toledo professor emeritus Al Compaan as its expert witness -- contended that wind and solar PV, combined with compressed air energy storage, could easily replace Davis-Besse's 908 megawatts of electricity during the 2017-2037 period. In 2011, the ASLB agreed to hear the contention. But on March 27, 2012, the five-member NRC Commission, responding to an appeal by FENOC, unanimously overruled the ASLB, rejecting the renewables-as-alternative-to-license-extension hearing. Interveners reassert their contention and call for the NRC Commissioners' order to be reversed, because they are simply wrong. The coalition reserves the right to appeal the rejection of its renewables contention to federal court, once the ASLB proceeding has concluded.
3. Beyond Nuclear's Radioactive Waste Watchdog, Kevin Kamps, also submitted five comments to NRC: #1, Jan. 10, 2012 SB cracking contention's relevance to DEIS; #2, four 2012 cracking contention supplements' (Feb. 27; June 4; July 16; July 23) relevance to DEIS; #3, fifth cracking contention supplement's (Aug. 16, 2012) relevance to DEIS; #4, Dec., 2010 backgrounder, "Davis-Besse Atomic Reactor: 20 MORE Years of Radioactive Russian Roulette on the Great Lakes Shore?!"; #5, Aug. 2012 SB summary report, "What Humpty Dumpty Doesn't Want You to Know: Davis-Besse's Cracked Concrete Containment Snow Job".
4. Joe DeMare's comments. Joe is a local resident near Davis-Besse. He is also an official intervener, as part of the environmental coalition, against the license extension. Joe is affiliated with the Ohio Green Party.