Search
JOIN OUR NETWORK

     

     

 

 

ARTICLE ARCHIVE
« "Industry push on Yucca Mountain troubles allies" | Main | "West Lake Landfill may be more contaminated than previously thought, company says" »
Friday
Jul312015

DTE doesn't oppose holding Fermi 3 Nuclear Waste Confidence matters in abeyance, pending resolution of NY v. NRC II appeal

On July 31st, Detroit Edison filed a response to Beyond Nuclear et al.'s motion to hold the proposed new Fermi 3 atomic reactor proceeding in abeyance. The nuclear utility agreed with Beyond Nuclear that the Nuclear Waste Confidence aspects of the proceeding should be held in abeyance, pending resolution of New York v. NRC II. However, DTE emphasized its desire that the other matters on appeal -- namely, quality assurance (or lack thereof), and transmission corridor "pre-construction" National Environmental Policy Act-compliance (or lack thereof) -- be resolved ASAP.

Detroit Edison proposes building a General Electric-Hitachi ESBWR (so-called "Economic Simplified Boiling Water Reactor") at its Fermi nuclear power plant site in Monroe County, MI, on the Lake Erie shoreline.