Search
JOIN OUR NETWORK

     

     

 

 

ARTICLE ARCHIVE
« Environmental coalition demands NEPA & AEA compliance re: Nuclear Waste Confidence in reactor licensing proceedings | Main | Battle lines drawn over Vermont Yankee decommissioning: "A Herculean task ahead" »
Tuesday
Jan272015

Entergy's Pilgrim atomic reactor to remain on NRC's "degraded cornerstone" list for second year, as winter storm bears down

NRC file photo of Entergy Nuclear's Pilgrim atomic reactor on Cape Cod Bay near BostonAs reported by The Enterprise, the U.S. Nuclear Regulatory Commission (NRC) has kept Entergy Nuclear's Pilgrim atomic reactor (photo, left), near Boston, on its "degraded cornerstone" list of worst performing atomic reactors in the country. Ironically, Entergy failed an NRC inspection, even though it told the agency when it was ready to be inspected. First of all, when do students get to tell the teacher when they're ready for the exam? And then fail the test?! Who's the regulator, and who's the regulated?!

This comes as a severe winter storm bears down on Boston. As the industry lobby and PR front, Nuclear Energy Institute, brags up nuclear power's supposed reliability during severe winter weather, anti-nuclear and environmental watchdogs near Pilgrim put out a press release warning that severe weather increases the safety risks of reactor operations and high-level radioactive waste (HLRW) management. Despite this, the reactor remains at 100% power, and inherently risky HLRW pool to dry cask transfer operations continue as if business is usual.

During Superstorm Sandy in 2012, the storm surge came precariously close to flooding safety-significant pumps needed to keep cooling water circulating in the HLRW storage pool at Pilgrim.

Pilgrim is an age-degraded, General Electric Mark I Boiling Water Reactor, identical in design to Fukushima Daiichi Units 1-4.