Search
JOIN OUR NETWORK

     

     

 

 

ARTICLE ARCHIVE
« Coalition of states, groups, and Native American tribe press appeal against NRC's false "Nuclear Waste Confidence" | Main | Take action! Help stop Canada's proposed radioactive waste dump targeted at the Great Lakes shore! »
Friday
Jun262015

Letter to the Editor: NRC's rules too weak at Davis-Besse

Beyond Nuclear's Kevin Kamps wrote a letter to the editor of the Port Clinton, OH News Herald on June 26, 2015, warning about safety significant systems, structures, and components that are too age-degraded to keep operating safely during FirstEnergy Nuclear's proposed 2017-2037 license extension at its problem-plagued Davis-Besse atomic reactor on the Lake Erie shore in Oak Harbor, OH.

Despite a severely cracked, and ever worsening, concrete containment Shield Building, and questions about how long its reactor lid will last this time, and how its experimental steam generator replacements will go, the U.S. Nuclear Regulatory Commission (NRC) is poised to rubber-stamp Davis-Besse's license extension.