Search
JOIN OUR NETWORK

     

     

 

 

« Entergy admits its faulty equipment caused 35 minute Super Bowl "lights out" | Main | Entergy Watch: New CEO admits times are tough at Entergy's merchant reactors »
Friday
Feb082013

Entergy Watch: Pilgrim Coalition urges NRC to require Mark I atomic reactor to shutdown during historic winter storm

 

Beyond Nuclear's "Freeze Our Fukushimas" pamphlet lists the 31 GE BWR Mark Is and IIs in the U.S. Entergy Nuclear's Pilgrim atomic reactor near Boston is a Mark I, identical in design to Fukushima Daiichi Units 1-4.

As reported by Wicked Local Plymouth, in the lead up to what is being reported as an historic winter storm about to hit the Northeast, Pilgrim Coalition and Cape Cod Bay Watch are calling on the U.S. Nuclear Regulatory Commission (NRC) to order Entergy's Pilgrim atomic reactor shutdown, "arguing that a prolonged power outage, flooding, high winds, and snow and ice could cause several serious problems at Pilgrim."

However, as of 2:30 PM, NRC's "Current Power Reactor Status" report shows that Pilgrim is operating at 83% power. All other reactors in the Northeast are also operating, either at, or very close to, 100% power levels.

In a press release, Pilgrim Coalition spokespeople stated:

“This is predicted to be a historic storm with severe consequences,” said Pine DuBois, Executive Director of Jones River Watershed Association. “Winds are supposed to pick up Friday night during high tide and continue through the even higher tide Saturday morning. Near hurricane gusts will be out of the east, hitting Pilgrim head-­‐on. At other times during high winds, Pilgrim’s water intake pumps have failed.”

“Entergy could not keep the lights on during the Super Bowl -­‐ can we be sure they’ll provide enough power to Pilgrim during the storm?” duBois added.

According to Karen Vale, Campaign Manager at Cape Cod Bay Watch, “This historic storm emphasizes that rising sea levels and frequent, more severe storms make Pilgrim’s continued operations increasing risky. We hope that the NRC will close Pilgrim until the threat of the storm passes.”

As Beyond Nuclear's Freeze Our Fukushimas campaign has warned, no matter the cause (earthquake and tsunami, or historic winter storm at high tide), any prolonged loss of power to atomic reactors can lead to meltdown and catastrophic radioactivity releases. Entergy's Pilgrim is an identical twin design to Fukushima Daiichi Units 1 to 4, a General Electric Mark I Boiling Water Reactor.