Search
JOIN OUR NETWORK

     

     

 

 

ARTICLE ARCHIVE

Entries by admin (2761)

Tuesday
Jan272015

Growing coalition opposes multi-billion dollar ratepayer bailout for FirstEnergy's Davis-Besse atomic reactor

NRC file photo of Davis-Besse on the Lake Erie shoreline east of ToledoAs reported by Tom Henry of The Toledo Blade, the Jan. 15 Public Utilities Commission of Ohio (PUCO) hearing in Toledo revealed a growing coalition of environmental, public interest, and consumer protection groups opposing a $3.2 billion (or larger) ratepayer bailout sought by FirstEnergy Nuclear Operating Company (FENOC) to prop up its dirty, dangerous and uncompetitive Davis-Besse atomic reactor on the Lake Erie shoreline, as well as its Sammis coal burner on the Ohio River in southeast OH. Policy Matters Ohio, Ohio Consumers Counsel (a state agency), and American Association of Retired Persons joined with groups like Beyond Nuclear, Don't Waste Michigan, Green Party of Ohio, and others, which have long resisted Davis-Besse's 20-year license extension.

Beyond Nuclear testified at the Toledo hearing, as well as the Akron hearing on Jan. 12. Public Citizen testified at the Jan. 20 hearing in Cleveland, as reported by the Cleveland Plain Dealer.

More.

Tuesday
Jan272015

NEIS media advisory: "Stop the Nuclear Bailout!" Mock Exelon "Fun(d)-Raiser"

"Burning money" image by Gene Case, Avenging AngelsOn Jan. 27, the City Club of Chicago is sponsoring a luncheon under the innocent-sounding heading of, “Illinois’ Energy Future: A Policy Discussion.”  However, two of the main speakers are spokespeople for  the Exelon-funded “Nuclear Matters” pro-nuclear front group, and a third a member of the Nuclear Energy Institute, the trade and lobbying association for the U.S.  nuclear power industry, whose current head is none other than Philip Crane – CEO of Exelon Corporation.  This heavily biased panel will be speaking to City Club members at a time when Exelon is engaged in attempting to win Illinois ratepayer-funded bailouts for its five money-losing reactors in Illinois from the Illinois Legislature and FERC.

Nuclear Energy Information Service (NEIS) is staging a “faux-fun(d)raiser” in Exelon’s behalf, to reduce the amount of money they will need to legally extort from Illinois ratepayers – and to send a message to the Governor, the Legislature and public about how absurd and full of audacity Exelon’s undeserved demands are. See NEIS's media advisory.

And see NEIS's press statement, “CHUTZPAH” OR TRANSFORMATION?  ILLINOIS LEGISLATURE MUST SOON DECIDE.

NEIS's director, Dave Kraft, rebutted "Nuclear Matters'" Carol Browner on WBEZ, NPR's Chicago affiliate, today.

Tuesday
Jan272015

Entergy's Pilgrim atomic reactor to remain on NRC's "degraded cornerstone" list for second year, as winter storm bears down 

As reported by The Enterprise, the U.S. Nuclear Regulatory Commission (NRC) has kept Entergy Nuclear's Pilgrim atomic reactor (photo, left), near Boston, on its "degraded cornerstone" list of worst performing atomic reactors in the country. Ironically, Entergy failed an NRC inspection, even though it told the agency when it was ready to be inspected. First of all, when do students get to tell the teacher when they're ready for the exam? And then fail the test?! Who's the regulator, and who's the regulated?!

This comes as a severe winter storm bears down on Boston. As the industry lobby and PR front, Nuclear Energy Institute, brags up nuclear power's supposed reliability during severe winter weather, anti-nuclear and environmental watchdogs near Pilgrim put out a press release warning that severe weather increases the safety risks of reactor operations and high-level radioactive waste (HLRW) management. Despite this, the reactor remains at 100% power, and inherently risky HLRW pool to dry cask transfer operations continue as if business is usual.

During Superstorm Sandy in 2012, the storm surge came precariously close to flooding safety-significant pumps needed to keep cooling water circulating in the HLRW storage pool at Pilgrim.

Pilgrim is an age-degraded, General Electric Mark I Boiling Water Reactor, identical in design to Fukushima Daiichi Units 1-4.

Sunday
Jan252015

Battle lines drawn over Vermont Yankee decommissioning: "A Herculean task ahead"

In an email action alert with the subject line "A Herculean Task Ahead," Leslie Sullivan Sachs of the Safe and Green Campaign in Brattleboro, Vermont has written today:

"Dear Friends of the Safe & Green Campaign,     

Listen to Kevin Kamps of Beyond Nuclear:

"I can point out to people that shutting down Vermont Yankee was a miracle, right? We weren’t, as the people, supposed to have that power. And people did it anyway. They insisted on it and they saw it through and made it happen. And so the same kind of courage and vision will have to be applied now to the decommissioning process. People have to stay in there, attend all the meetings, read all the documents. It’s a Herculean task and if anybody can do it, it’s the folks who have already forced the shutdown of Vermont Yankee." [Nuclear Free Future Yankee Post-Mortem 01.06.15]

It’s time – again - to show up and create a miracle. We need your courage and vision for the next month, while the focus is on Entergy’s decommissioning plan for Vermont Yankee. There are a lot of inspiring stories in this newsletter, most created by our own folks. First, mark your calendar with these events:

  •       Jan. 28  NDCAP Meeting
  •       Feb. 5   NRC Webinar on Yankee Decommissioning
  •       Feb. 9   Forum to prep for NRC Public Hearing (Safe & Green and CAN)
  •       Feb. 19 NRC Public Hearing on decommissioning plan

All the above, as well as events planned for March and April, are on the agenda of the Safe and Green Campaign steering committee’s next meeting on February 2nd. We meet once or twice a month on Mondays at 5:30pm, and it’s always a pot luck supper. Email safeandgreencampaign@gmail.com if you’re interested in more info.

NDCAP January 28: Vermont's Nuclear Decommissioning Citizens Advisory Panel will meet next Wednesday, January 28 at the Quality Inn (Putney Road, Brattleboro) from 6-9pm. (This is a change from the Jan. 22 date set at the December meeting). All NDCAP meetings are open to the public, and there is time after each Agenda item for public comment. We will post an agenda on our website once it is available.

NRC webinar on VT Yankee on February 5 at 3:00pm “to provide key facts about the decommissioning process and how the NRC regulates such activities through on-site inspections and other reviews… view slides prepared by NRC staff and ask questions in writing via a web page set up to host the session. Online registration is required to take part.” Click here to register.

Arnie Gundersen and Deb Katz will speak at a Forum on Entergy’s decommissioning plan on February 9th, from 6-9pm at Marlboro Graduate Center, downtown Brattleboro. The Safe and Green Campaign and the Citizens Awareness Network will co-host. The presentations, with time for Q&A, will help you prepare remarks for the one and only NRC hearing, and to write your comments to the NRC (March 23 deadline). Forums before the NRC public hearing are also planned for Montpelier and Greenfield. Please visit to our Decommissioning Resources page for issues we have identified to date and for info how to comment.

NRC public hearing on decommissioning Vermont Yankee - February 19, 6-9pm at the Quality Inn in Brattleboro).  Details on the hearing and how to submit written comments are on our website here..."

Friday
Jan232015

"Big, nuke-heavy utility looking for new ratepayers to fleece" 

ORGANIZE!As reported by David Roberts at Grist, Exelon Nuclear proposed takeover of Pepco represents a "Big, nuke-heavy utility looking for new ratepayers to fleece." It is part and parcel of Exelon's desperate bid to keep its dirty, dangerous, uncompetitive, aging nuclear power reactor fleet afloat. But anti-nuclear and environmental groups, the public interest movement, businesses, and consumer and ratepayer advocates are fighting back.