Search
JOIN OUR NETWORK

     

     

 

 

Relicensing

The U.S. nuclear reactor fleet is aging but owners are applying to the Nuclear Regulatory Commission for license extensions to operate reactors an additional 20 years beyond their licensed lifetimes. Beyond Nuclear is challenging and opposing relicensing efforts.

.................................................................................................................................................................................................................

Entries by admin (239)

Friday
Jun262015

Letter to the Editor: NRC's rules too weak at Davis-Besse

Beyond Nuclear's Kevin Kamps wrote a letter to the editor of the Port Clinton, OH News Herald on June 26, 2015, warning about safety significant systems, structures, and components that are too age-degraded to keep operating safely during FirstEnergy Nuclear's proposed 2017-2037 license extension at its problem-plagued Davis-Besse atomic reactor on the Lake Erie shore in Oak Harbor, OH.

Despite a severely cracked, and ever worsening, concrete containment Shield Building, and questions about how long its reactor lid will last this time, and how its experimental steam generator replacements will go, the U.S. Nuclear Regulatory Commission (NRC) is poised to rubber-stamp Davis-Besse's license extension.

Monday
Jun222015

Entergy's Palisades but the canary in the coal mine for age-degraded RPV risks

NRC file photo of Entergy Nuclear's Palisades atomic reactor, located on the Lake Michigan shoreline in Covert, MIA U.S. Nuclear Regulatory Commission (NRC) Atomic Safety and Licensing Board Panel (ASLBP) has granted an evidentiary hearing on the merits of concerns regarding the risks of a ductile tear, or fracture, of Entergy Nuclear's severely embrittled Palisades atomic reactor pressure vessel (RPV), located in Covert, MI on the Lake Michigan shore (see photo, left). Toledo-based attorney, Terry Lodge, filed the petition on behalf of an environmental coalition (Beyond Nuclear, Don't Waste MI, Michigan Safe Energy Future, and Nuclear Energy Information Service). Arnie Gundersen, Chief Engineer at Fairewinds Associates, Inc. in Burlington, Vermont, serves as the coalition's expert witness.

Although Entergy's Palisades has the worst embrittled RPV in the U.S., it is but the canary in the coal mine. As revealed in an April 2013 NRC document (see point #4, on page 5 of 15 on PDF counter), Next Era's (Florida Power & Light's) Point Beach Unit 2, also located on the Lake Michigan shore in Wisconsin, is nearly as bad. Following not very far behind in terms of RPV fracture risk are Entergy's Indian Point Unit 3 near New York City, Pacific Gas & Electric's Diablo Canyon on the California coast, and FirstEnergy's Beaver Valley Unit 1 in Shippingport, Pennsylvania. FirstEnergy has also been required to have an Aging Management Plan for RPV embrittlement at its Davis-Besse atomic reactor on the Lake Erie shore near Toledo, an indication that this is a serious concern there as well.

RPV age-related degradation was the top safety concern of a broad environmental and public interest coalition's efforts, from 2005 to 2007, to block Palisades' 20-year license extension. However, the NRC ASLBP overseeing that proceeding simply rubber-stamped Palisades' license extension application, as did the full NRC Commission. Intervenors' concerns were dismissed, based on mere legalistic technicalities. The ASLBP at the time chastised the intervening coalition, scolding them that NRC's intervention rules are "strict by design."

More.

Wednesday
Mar252015

Nuclear Licensing Board Examines Brittle Vessel Risks at Entergy’s Palisades Atomic Reactor; Critics Call for Permanent Shutdown

NRC file photo of Entergy Nuclear's Palisades atomic reactor on the Lake Michigan shore in Covert, MIAs reported by a press release, a coalition of environmental groups, including Beyond Nuclear, today testified before the U.S. Nuclear Regulatory Commission's (NRC) Atomic Safety and Licensing Board (ASLB), at the agency's HQ in Rockville, Maryland, just outside D.C.

The coalition, represented by Toledo attorney Terry Lodge, defended its intervention against an Entergy License Amendment Request (LAR) to further weaken reactor pressure vessel (RPV) embrittlement/pressurized thermal shock (PTS) safety regulations.

Palisades has the worst-embrittled RPV in the U.S., at risk of a PTS fracture, Loss-of-Coolant-Accident, core meltdown, and catastrophic release of hazardous radioactivity. A bad precedent at Palisades will then be applied by NRC to approve operations at other dangerously brittle pressurized water reactor (PWR) RPVs across the U.S.

The coalition intervened on Dec. 1, 2014. Entergy Nuclear and NRC staff counter-attacked on Jan. 12, 2015. The coalition rebutted the attacks on Jan. 20.

Today's "oral argument pre-hearing" was essentially an ASLB exercise to determine whether the coalition's intervenion is worthy of an evidentiary hearing on the merits of the contention. The ASLB is scheduled to rule on the admissibility of the intervenors' contention within 45 days.

On March 9, the coalition filed a parallel intervention regarding loss of Charpy V-Notch Upper-Shelf Energy in Palisades RPV, another form of age-related degradation.

From 2005 to 2007, a broad environmental coalition sought to block Palisades' 20-year license extension. The coalition's main safety objection was PTS risks. NRC rubber-stamped the extension anyway.

Tuesday
Jan272015

"Relicensing Limerick nuke plant ignores safety risks"

NRC file photo of Exelon's twin GE Mark II BWR Limerick nuclear power plant. While NRC claims everything is coming up flowers, critics beg to differ.Dr. Lewis Cuthbert, President of the Alliance for a Clean Environment, has written an op-ed to the Pottstown (PA) Mercury, opposing the U.S. Nuclear Regulatory Commission's rubberstamp of a 20-year license extension at Exelon Nuclear's twin reactor Limerick nuclear power plant, near Philadelphia.

Limerick Units 1 and 2 are General Electric Mark II Boiling Water Reactors, very similar in design to the Fukushima Daiichi Units 1 to 4 Mark Is.

Natural Resources Defense Council (NRDC) intervened against the license extension before an NRC Atomic Safety and Licensing Board panel. NRDC raised Severe Accident Mitigation Alternatives (SAMA) analyses contentions. But their contentions fell on deaf ears, and NRC rubberstamped the license extension anyway.

As revealed in the 1982 NRC-commissioned CRAC-2 report ("Calculation of Reactor Accident Consequences"), Limerick's proximity to the densely populated Philadelphia metro area means a catastrophic radioactivity release there would inflict some of the worst casualties and property damages in the entire country downwind of atomic reactors.

Monday
Dec222014

Nuclear Crack Down?

Did you know that embrittled nuclear reactors could shatter like glass? Watch Fairewinds Energy Education's Nuclear Science Guy Arnie Gundersen (photo, left) demonstrate reactor embrittlement and imagine the shattering glass as a shattering nuclear reactor vessel. Learn more.

Arnie, Chief Engineer at Fairewinds Associates, Inc., serves as expert witness for an environmental coalition, including Beyond Nuclear, challenging Entergy Nuclear's application to weaken reactor pressure vessel (RPV) embrittlement safety standards, yet again, at its Palisades atomic reactor in s.w. MI on the Lake Michigan shoreline. Palisades has the worst embrittled RPV in the U.S., at risk of pressurized thermal shock (PTS), fracture, Loss-of-Coolant-Accident, core meltdown, containment failure, and catastrophic release of hazardous radioactivity.

NRC rubber-stamped Palisades' 20-year license extension in 2007, steamrolling an environmental coalition's intervention in opposition. The primary technical safety focus of the coalition was RPV embrittlement and PTS risk. See the chronicle of this 2005-2007 intervenion, posted online at the NIRS website.