Search
JOIN OUR NETWORK

     

     

 

 

« Resistance continues, as ISP, TX CISF poised for final approval by NRC in the next several weeks | Main | The Hazards of Transporting Radioactive Waste from Vermont Yankee »
Monday
Jun212021

Construction Accident At Nuclear Plant Knocks Out Power Along Jersey Shore

As reported by the Daily Voice.

NJ-based Holtec, in charge of the Oyster Creek decommissioning, has made screw up after screw up there thus far. In one screw up, a worker was doused and dosed with radioactive water, when a high-level radioactive waste storage (HLRW) container leaked.

But not only does Holtec want to be trusted with HLRW on-site storage at places like Oyster Creek. It also wants to ship the HLRWs to New Mexico, for "interim storage."