Search
JOIN OUR NETWORK

     

     

 

 

« Watchdogs continue to hound Entergy Pilgrim | Main | 'Severe abnormalities' found in Fukushima butterflies »
Saturday
Sep012012

Anti-nuclear drum beat continues against Vermont Yankee

Thanks to Debra Stoleroff of Vermont Yankee Decommissioning Alliance for sharing with us news of "three opportunities to keep the fact that Vermont Yankee is still operating in the public eye and to voice your opinion regarding this fact that Entergy continues to undermine Vermont's democratic process for its own profits; gambling away the health of people in VT, MA, and NH as well as our environment.   Vermont Yankee nuclear power plant remains an accident away from devestating the region."

Sat, Sept. 1: We Are Not Going Away Until VT Yankee is Shut Down and Safely Decommissioned With a Greenfield

Sat, Sept. 8: Our River Runs Through It Flotilla Down the Connecticut River to VT Yankee (see event poster, left, and SAGE Alliance website for details). A major theme of this flotilla is Vermont Yankee's negative impact on the aquatic ecosystem in the Connecticut River, as to fish species (as shown on the poster!)

Sun, Sept. 23: Burlington Friends Meeting at Vermont Yankee followed by NVCD at Vt Yankee

For more info., see Beyond Nuclear's NUCLEAR POWER website section.

The five member NRC Commission unanimously rubberstamped Vermont Yankee's 20 year license extension on 3/10/11, one day before the beginning of the Fukushima nuclear catastrophe. NRC Staff then finalized the paperwork on the rubberstamp a couple weeks later. Vermont Yankee and Fukushima Daiichi Units 1 to 4 are identidically designed: General Electric Mark I Boiling Water Reactors.