The Nuclear Retreat

We coined the term, "Nuclear Retreat" here at Beyond Nuclear to counter the nuclear industry's preposterous "nuclear renaissance" propaganda campaign. You've probably seen "Nuclear Retreat" picked up elsewhere and no wonder - the alleged nuclear revival so far looks more like a lot of running away. On this page we will keep tabs on every latest nuclear retreat as more and more proposed new nuclear programs are canceled.

.................................................................................................................................................................................................................

Thursday
Jan172013

Forbes: "the nuclear renaissance may be largely over before it started" 

"Burning Money" image by Gene Case of Avenging AngelsPeter Kelly-Detwiler, Contributor to Forbes, has published an op-ed entitled "New Centralized Nuclear Plants: Still an Investment Worth Making?" In it, he concludes that "the nuclear renaissance may be largely over before it started," with not only the vast majority of proposed new reactors in the U.S. being cancelled, but even paid-off old reactors like Kewaunee in Wisconsin being permanently shutdown due to crushing economics -- such as the expense of major, vitally needed safety repairs at the 40-year old reactor.

Kelly-Detwiler cites the "takes too long," "costs too much," and "bet-the-farm" nature of nuclear power for the "failure to launch" of the nuclear relapse.

Regarding that last point, Kelly-Detwiler writes:

'So it appears that the nuclear renaissance may be largely over before it started.  And yet, many projects have not yet been canceled, with utilities and ratepayers accepting ever more risk in order to rescue sunk costs. In many cases, these costs have soared or will soar into the billions. As risk management expert Russell Walker of the Kellogg School of Management is quoted as saying in the Tampa Bay Times “When the stakes get higher, it gets harder for organizations to walk away…this happens a lot.  It’s the same problem a gambler has: If I play a little longer, it’ll come around.” '

If the op-ed's title is meant to imply that so-called small modular reactors might still save the day for the retreating nuclear power industry, it must be pointed out that the supposed justification for giant-sized proposed new reactors (such as the AP1000, at 1,100 MWe; the ESBWR at 1,500 MWe; the EPR at 1,600 MWe; etc.) was "economies of scale." Since small modular reactors represent the opposite end of the spectrum, it stands to reason these would be even more expensive than their super-sized, failed siblings.

In a classic February 14, 1985 piece entitled “Nuclear Follies,” Forbes wrote: 

"The failure of the U.S. nuclear power program ranks as the largest managerial disaster in business history, a disaster on a monumental scale. The utility industry has already invested $125 billion in nuclear power, with an additional $140 billion to come before the decade is out, and only the blind, or the biased, can now think that the money has been well spent. It is a defeat for the U.S. consumer and for the competitiveness of U.S. industry, for the utilities that undertook the program and for the private enterprise system that made it possible.”

Thursday
Jan172013

The nuclear relapse has derailed -- literally!

Photo by: Tom Clements, Alliance for Nuclear AccountabilityTom Clements of Alliance for Nuclear Accountability in South Carolina has documented, in photo and blog, a most remarkable development: the AP1000 nuclear reactor vessel targeted at Vogtle, Georgia has been discovered unprotected, stranded in Savannah Port since a December 15 shipment failure. Tom's remarkable blog is posted at the Aiken Leader. Connect Savannah has also reported on the "Nuclear Train Wreck."

As Tom has described it: the reactor pressure vessel (RPV) for the chronically delayed Vogtle AP1000 reactor construction project near Waynesboro, Georgia sits stranded and seemingly unprotected in the port of Savannah. The special railroad car carrying the 300-ton vessel had unknown mechanical problems on December 15 on exiting the port.  The NRC has said that the vessel only got one-quarter mile before a sound was heard and the car stopped.  Plans by Westinghouse and Southern Company to move the vessel are unknown. It is also unknown if the railroad car can be repaired and used or if the railroad company which owns the line is concerned that the rail car might break down again on its line in an in accessible place.  Meanwhile, the apparently unguarded reactor might be subject to sabotage and sits in apparent violation of NRC quality assurance and "administrative control" regulations.

Thursday
Jan102013

Dominion's domino may be but the first to fall: Kewaunee "canary in the coal mine" may signal number of reactor closures to come

In late October, 2012, Dominion Nuclear announced it would close its Kewaunee atomic reactor on the Lake Michigan shore of northern Wisconsin by mid-2013.

As reported in an article at AOL Energy, by a former nuclear power industry 20-year veteran worker:

"A pattern is developing. It may take a few years, but it appears small nuclear plants will face increasing pressure to retire early. They cannot compete, particularly in soft markets. Some plants will find their costs consistently exceed any benefits they earn and their owners will be forced to retire and dismember plants."

The author, Glenn S.K. Williams, in his article "The Nation's Nuclear Plants Are Nuked," lists the following reactors as at risk of "early retirement": NextEra/FPL's Point Beach nuclear plant in WI; certain of Exelon's IL reactors, as well as its Oyster Creek in NJ; Duke's Crystal River in FL; Southern CA Edison's San Onofre; Entergy's Vermont Yankee, as well as Indian Point in NY.

Platts has also reported on a UBS Securities analyst's prediction that Entergy's FitzPatrick, NY and Vermont Yankee, as well as Exelon's Clinton, IL and Ginna, NY "merchant" reactors in deregulated markets, are under intense pressure to "retire early." 

(We would point out that "early retirement" at any of the 73 atomic reactors granted 20-year license extensions by the U.S. Nuclear Regulatory Commission is a contradiction in terms!)

 

Thursday
Dec272012

INVITATION to CELEBRATE: The Nuclear Age in Quebec is Over! Gentilly-2 is SHUT DOWN!

"Rest in Peace, Gentilly-2". Image compliments of CentricoisES et mauricienNEs pour le déclassement nucléaireThis tremendous good news just came in from Dr. Gordon Edwards, chair of the Canadian Coalition for Nuclear Responsibility, and co-chair of the Great Lakes United Nuclear-Free/Green Energy Task Force:

28 December: The Nuclear Age in Quebec is Over! 

Join us, in Montréal, at 1 o'clock in the afternoon

On this occasion, Sonomi and her two children-- refugees from Fukushima, Japan -- will be our special guests.

P.S. Québec will be truly out of the nuclear age only when we achieve a permanent moratorium on uranium mining, as has been done in two other provinces -- Nova Scotia and British Columbia!

(Nuclear utility Hydro-Quebec announced Gentilly-2's permanent shutdown, to occur tomorrow, last October. Gentilly-2 is a CANDU atomic reactor which has operated since 1982.)

Wednesday
Nov212012

Areva moves to wind energy as nuclear continues to slide

From Reuters: French nuclear power engineering giant Areva is planning to set up an offshore wind turbine factory in the east of Scotland, which could create 750 jobs, the group said on Monday.

Areva plans to invest "several 10s of million euros", Chief Executive Luc Oursel said at a news conference, and the plant for Areva's 5 megawatt turbines should be up and running in 2015 or 2016, he said.

"Areva has chosen to locate its future facility in east Scotland to optimise logistics costs for UK projects and to benefit from a growing cluster of offshore supply chain businesses in the area," Areva said in a statement earlier.

A memorandum of understanding was signed by Scottish First Minister Alex Salmond during a visit to Paris, the state-owned group said.

The Scottish site, which has yet to be identified, will be Areva's third European site for offshore turbines, alongside a future plant in Le Havre in northern France and Germany's existing Bremerhaven factory.