An environmental coalition, represented by attorney Terry Lodge of Toledo (photo, left), has filed a defense of its contention alleging that FirstEnergy Nuclear Operating Company's (FENOC) Davis-Besse atomic reactor on the Lake Erie shore should be denied a 20-year license extension by the U.S. Nuclear Regulatory Commission (NRC). Most recently, Davis-Besse's concrete containment Shield Building has exhibited ever more severe cracking, steel reinforcement damage, as well as wall gap 80% of the way through its 2.5 foot thickness (an air space, or void, through 24 of 30 inches of the wall). The filing rebuts challenges against the contention by FENOC and NRC Staff.
As official intervenors in the NRC Atomic Safety (sic) and Licensing Board (ASLB) proceeding, the coalition, comprised of Beyond Nuclear, Citizens Environment Coalition of Southwestern Ontario, Don't Waste Michigan, and the Ohio Green Party, has resisted Davis-Besse's 20-year license extension since the end of 2010. Davis-Besse's 40-year operating license expires on Earth Day (April 22), 2017. This is the coalition's sixth contention filed.