An  environmental coalition, including Beyond Nuclear, is working at fever  pitch against degraded old, and proposed new, reactors on the Great  Lakes shoreline in southeast Michigan and northwest Ohio.
Davis-Besse, OH
At U.S. Nuclear Regulatory Commission (NRC) headquarters in  Rockville, Maryland, the groups Beyond Nuclear, Citizens Environment  Alliance of Southwestern Ontario (CEA), Don't Waste Michigan, and the  Green Party of Ohio pressed their case against a 20-year license  extension at FirstEnergy Nuclear Operating Company's problem-plagued  Davis-Besse atomic reactor east of Toledo. An oral argument pre-hearing was ordered to take place on Nov. 12th by the NRC Atomic Safety and  Licensing Board Panel (ASLBP) overseeing the License Renewal Application  (LRA) proceeding. The coalition first intervented against the license  extension nearly four years ago.
Attorney Terry Lodge, Beyond Nuclear's Kevin Kamps, and Don't Waste  MI's Michael Keegan represented the coalition before NRC ASLBP. The  coalition was joined by expert witness Arnie Gundersen, Chief Engineer  of Fairewinds Associates, Inc. The focus of the day-long hearing was the  severe, and worsening, cracking of Davis-Besse's concrete containment  Shield Building. The dangerously deteriorating Shield Building is the  last line of defense against a catastrophic release of hazardous  radioactivity, as from a reactor core meltdown and Inner Steel  Containment Vessel failure due to a reactor disaster, earthquake,  tornado missile, etc. The coalition has filed numerous contentions about the cracking since it was first revealed on October 10, 2011.
The coalition issued a press advisory about the Nov. 12th oral hearing. The Toledo Blade has reported on this story.
Fermi 2, MI
Beyond Nuclear, CEA, and Don't Waste MI, again represented by Toledo-attorney Terry Lodge, will appear at oral argument pre-hearings before an NRC ASLB on November 20th in Monroe, Michigan.  The coalition is opposing the 20-year license extension proposed at  Detroit Edison's Fermi 2 atomic reactor in nearby Frenchtown Township,  on the Lake Erie shore. Fermi 2 is the single biggest G.E. Mark I  Boiling Water Reactor in the world -- the same design as melted down and  exploded, times three, at Fukushima Daiichi, Japan.
Beyond Nuclear's Reactor Oversight Director, Paul Gunter, will argue a  contention calling for radiological filters on hardened vents, an  obviously needed safety upgrade actively ignored by a majority of the  NRC Commissioners, despite the lessons that should have been learned  from the Fukushima nuclear catastrophe. Beyond Nuclear's Freeze Our Fukushimas campaign calls for the shutdown of all U.S. Mark I and II reactors. (See Beyond Nuclear's Freeze Our Fukushimas pamphlet.)
Beyond Nuclear's Radioactive Waste Watchdog, Kevin Kamps, will argue a  contention regarding serious safety risks associated with the Fermi  nuclear power plant's off-site transmission line corridor, as well as  radioactive waste contentions.
Another group, Citizens Resistance at Fermi Two (CRAFT), has launched another 15 contentions against the license extension.
Fermi 3, MI
The coalition comprised of Beyond Nuclear, Citizens for Alternatives  to Chemical Contamination (CACC), CEA, Don't Waste MI, and the Sierra  Club Michigan Chapter -- again represented by attorney Terry Lodge --  continues to press its case against the proposed new Fermi 3 reactor, to  be built on the very site that the Fermi 1 "We Almost Lost Detroit"   reactor partially melted down on October 5, 1966.
The coalition intervened against Fermi 3 on March 9, 2009, and has since filed dozens of contentions against the proposal.
Its transmission line corridor NEPA (National Environmental Policy  Act) contention is still before the NRC Commissioners, thanks to a sua sponte motion by the NRC ASLBP itself. On behalf of the coalition, Lodge just filed a motion with the NRC Commissioners,  supporting the ASLBP's request to the Commissioners for permission to  carry out its own independent review of what appears to be NRC staff  violations of NEPA, for not including the required "hard look" at the  environmental impacts of Fermi 3's transmission line corridor in the  FEIS (Final Environmental Impact Statement).
In addition, the coalition has appealed the ASLBP's rejection of its  quality assurance (QA) contention to the full NRC Commission. Arnie  Gundersen of Fairewinds serves as the coalition's Fermi 3 QA expert  witness. The NRC Commissioners will likely rule on the QA and  transmission corridor contentions in the near future.