On Dec. 16th, the U.S. Nuclear Regulatory Commission's (NRC) five Commissioners, in a unanimous ruling, denied an environmental coalition's appeal in the NRC Atomic Safety and Licensing Board (ASLB) proceeding on Detroit Edison's (DTE) proposed new Fermi 3 reactor in southeast MI on the Lake Erie shore. DTE proposes to construct and operate an untested General Electric-Hitachi (GEH), so-called "Economic, Simplified Boiling Water Reactor" (ESBWR) on the very spot where Fermi 1 had a partial meltdown in 1966, immediately adjacent to the Fukushima Daiichi twin-design Fermi 2, a GE Mark I BWR.
The coalition requested reconsideration of the ASLB's June 2014 ruling that DTE's Fermi 3 quality assurance (QA) program was adequate, reasserting its preponderence of evidence -- including the testimony of Fairewinds Associates, Inc.'s Chief Engineer, Arnie Gundersen -- that DTE's QA program was in fact in disarray, or even non-existent. The coalition intends to appeal this NRC ruling, and other pending matters, to the federal courts, if need be. More.