Beyond Nuclear slams GE-Hitachi ESBWR design for QA violations at Fermi 3
December 26, 2009
admin

Beyond Nuclear -- in coalition with Citizens for Alternatives to Chemical Contamination, Citizens Environmental Alliance of Southwestern Ontario, Don’t Waste Michigan, and the Michigan Chapter of the Sierra Club -- has filed its 16th contention in the Fermi 3 new reactor proceeding before an NRC licensing board challenging the quality assurance violations associated with General Electric-Hitachi's "Economic Simplified Boiling Water Reactor" design. The coalition has called for the new reactor licensing proceeding to be suspended until QA on the ESBWR design can be assured. As expressed in the Beyond Nuclear media release, the QA violations surrounding Fermi 3 are three-fold: QA failures on Detroit Edison's combined Construction and Operating License Application (COLA), QA failures on General Electric-Hitachi's ESBWR design, and QA regulatory oversight failures by NRC staff itself. Beyond Nuclear's "Nuclear Reactors" website section shows the original Nov. 6 QA contention filing against Fermi 3, as well as the initial overall intervention launched on March 9, 2009. (Pictured, Terry Lodge, attorney working on behalf of the coalition.)

Article originally appeared on Beyond Nuclear (https://archive.beyondnuclear.org/).
See website for complete article licensing information.