The EDF-owended Flamanville 1 reactor on France's Normandy coast experienced a radioactive leak late on October 24th. Although downplayed by the French nuclear authority, a French watchdog group based near Flamanville received direct reports from workers, who described a very close call that almost cost three plant workers their lives. The unit had been shut down since the end of July for refueling. Around 42,000 liters of 300°C radioactive water escaped from a primary cooling circuit, contaminating the reactor building. Flamanville has two operating reactors, with the third, an EPR design, still under construction but way behind schedule and over budget.