Search
JOIN OUR NETWORK

     

     

 

 

ARTICLE ARCHIVE

Nuclear Reactors

The nuclear industry is more than 50 years old. Its history is replete with a colossal financial disaster and a multitude of near-misses and catastrophic accidents like Three Mile Island and Chornobyl. Beyond Nuclear works to expose the risks and dangers posed by an aging and deteriorating reactor industry and the unproven designs being proposed for new construction.

.................................................................................................................................................................................................................

Entries by admin (520)

Monday
Jun032013

Great Lakes Region Nuclear Hotspots Map

John Jackson of Great Lakes United (GLU) and Anna Tilman of International Institute of Concern for Public Health (IICPH) have released an updated map of Nuclear Hotspots in the Great Lakes Region (see image, left):

"Great Lakes United and the International Institute of Concern for Public Health (IICPH) released today the Great Lakes Nuclear Hot Spots Map, providing a detailed regional, binational view of nuclear facilities in the Great Lakes Region. As the map shows, with the exception of Lake Superior, each of the Great Lakes has numerous nuclear sites related to nuclear power generation, most of which are located within one kilometre of the Lakes. This raises concerns about the cumulative impacts of radioactive releases over the years from so many sites. It also shows the numerous places where a serious nuclear accident could occur in the region.

This map marks the first comprehensive update of this information in 15 years and highlights the lack of information about radioactive releases from these facilities. In 1998, the International Joint Commission’s (IJC) Task Force on Inventory of Radionuclides released an assessment of nuclear facilities around the basin. At the time, the Task Force concluded that releases from nuclear facilities were substantial, but that the extent of knowledge about the releases and their impacts was “limited”.   http://www.ijc.org/files/publications/C131.pdf

The map includes all aspects of nuclear power production in the Great Lakes region, including the 38 operating nuclear power plants, 12 closed plants, and four new plants proposed in Canada. It also includes the facilities that process uranium ore and manufacture the pellets, as well as tailings sites from uranium mining and milling, and facilities that store, and dispose of radioactive waste. Every site on the map is a radioactive waste site, whether operating or not.

The Great Lakes Nuclear Hot Spots Map provides a critical resource for communities concerned about the potential for radioactive waste releases into the Great Lakes and St. Lawrence River. Additionally, it shows the sites under consideration by the Canadian Government for storing Canada’s nuclear fuel waste. Most of the proposed sites lie within the Great Lakes basin. With the potential for new disposal sites within easy access of the Great Lakes, communities are concerned that nuclear waste could be brought in via ships, creating substantial risks of spills along Great Lakes-St. Lawrence River shipping lanes and during loading and unloading near shore.

The Citizens’ Clearinghouse on Waste Management contributed funding to this project."

The map updates work from 1990-1991 published by Irene Kock and Dave Martin of Nuclear Awareness Project.

Beyond Nuclear has also compiled a listing of major U.S. municipalities downstream of the proposed Bruce DUD on the Great Lakes shorelines of MI, OH, PA, and NY, as well as a listing of major municipalities in upstate New York directly across Lake Ontario from the nuclear power plants (Pickering, Darlington) and uranium processing facility (Port Hope) east of Toronto.

Friday
May312013

Environmental coalition rebuts challenges against Fermi 3 proposed new reactor contention

Environmental coalition attorney Terry Lodge of ToledoAttorney Terry Lodge of Toledo (photo, left), and expert witness Arnie Gundersen, Chief Engineer at Fairewinds Associates, Inc, have filed a rebuttal against challenges brought by Detroit Edison and the U.S. Nuclear Regulatory Commission staff (NRC) regarding Quality Assurance (QA) contentions in opposition to the proposed new Fermi 3 atomic reactor.

The rebuttal includes expert witness testimony by Gundersen, and an"Intervenor's Rebuttal Statement of Position" legal filing by Lodge.

Lodge and Gundersen filed their rebuttal on behalf of an environmental coalition comprised of Beyond Nuclear, Citizens for Alternatives to Chemical Contamination, Citizens Environment Alliance of Southwestern Ontario, Don't Waste Michigan, and the Sierra Club's Michigan Chapter.

Fermi 3 is a proposed new General Electric-Hitachi so-called "ESBWR" ("Economic Simplified Boiling Water Reactor"), targeted at the Lake Erie shoreline in Monroe County, Michigan, 8 miles as the crow flies (or the radioactivity blows) from Ontario, Canada.

NRC Atomic Safety and Licensing Board hearings are set for Halloween on not only this QA contention, but also an Eastern Fox Snake threatened species contention. In addition, Fermi 3's combined Construction and Operation License Application (COLA) cannot be finalized until NRC completes its court-ordered Environmental Impact Statement on its so-called [High-Level] Nuclear Waste Confidence Rule, a proceeding that could take years.

Thursday
May162013

NRC muddies public hearing process on restart of crippled CA nuke

On May 13, 2013, an Atomic Safety Licensing Board (ASLB) of the Nuclear Regulatory Commission (NRC)  ruled in favor of Friends of the Earth (FoE) that the Southern California Edison's bid to restart its damaged Unit 2 at the San Onofre Nuclear Generating Station (SONGS) limited to 70% of its power rating is an “experiment.”

The Board determined that such tests and experiments with public safety require a public hearing and an opportunity to intervene before the operator is allowed to start up the atomic reactor. In response to its own licensing board Order and Memorandum, NRC Office of Public Affairs spokesman Scott Burnell put their own spin on the practical effect of the Order by saying that the staff's current restart review is its own independent process.

The press office interpretation is that the staff could green light the restart of the nuke despite the Order.

The Licensing Board can appeal to the Commission.  But, it would not be unprecedented for the five politically appointed Commissioners to overrule the judgment of its licensing board. SONGS Units 2 and 3 have been closed since January 2012 because of severe damage to $600 million in new steam generator replacements after just 10 months of operation following the installation of a botched power uprate design. 

Hundreds of millions of dollars in the loss of company stockholder dividends and additional ratepayer charges are at stake.

Tuesday
May142013

Coalition of local residents and environmental groups confronts Congress, NRC, and Entergy at Palisades' front entrance

When Rep. Upton and NRC Commissioner Svinicki refused to meet with the coalition, Beyond Nuclear's Kevin Kamps helped organize a vigil at Palisades' front entrance. He dressed as the Little Dutch Boy. His sign reads "Have Finger--Will Plug Radioactive Leak," and "Wooden Shoe Rather Use Wind Power?!" Palisades' latest leak happened amidst west Michigan's Dutch American annual tulip time festivals. Photo credit Lindsey Smith / Michigan Radio.While U.S. Congressman Fred Upton (R-MI), Chairman of the House Energy and Commerce Committee, and U.S. Nuclear Regulatory Commission (NRC) Commissioner Kristine Svinicki, toured Entergy's problem-plagued Palisades atomic reactor, a coalition of concerned local residents and environmental groups, including Beyond Nuclear, vigiled and protested at the front entrance.

Upton and Svinicki were visiting the atomic reactor in the aftermath of a 82.1-gallon spill of radioactive water into Lake Michigan. The leak came from the Safety Injection Refueling Water (SIRW) storage tank, which has been leaking for over two years. Although the investigation continues, it appears that a crack in a weld on a tank floor nozzle is at least partly to blame this time around. For the first year, the leak had been kept quiet by Entergy and NRC staff. Even the Chairman of NRC, Greg Jaczko, was not told about it, even during his tour of the troubled plant on May 25, 2012. A few weeks later, based on whistleblower revelations, U.S. Congressman Ed Markey (D-MA) made public that the leakage was into the control room, and that safety culture among the workforce had collapsed at Palisades: 74% of the workforce,including management, felt that reporting safety problems would solve nothing, while inviting intimidation and harassment -- and so do not report safety problems!

Beyond Nuclear has posted extensive media coverage from the vigil at its Nuclear Reactor Safety website page.

Thursday
May092013

"Worst Week Since Fukushima: 4 Major Setbacks in 3 Days Are Latest Stumbles for U.S. Nuclear Power Industry"

Former NRC Commissioner Peter Bradford, and energy economist Mark Cooper, both of the Vermont Law School, as well as Dan Hirsch of the Committee to Bridge the Gap, held a telephone press conference yesterday on the subject of "WORST WEEK SINCE FUKUSHIMA: 4 MAJOR SETBACKS IN 3 DAYS ARE LATEST STUMBLES FOR U.S. NUCLEAR POWER INDUSTRY." An audio recording of the news conference has been posted online.

The four setbacks in three days include: 1) the cancellation of two proposed new reactors at South Texas Project, because they violate U.S. law against foreign ownership of nuclear power plants; 2) Southern California Edison's threat that if NRC does not allow it to restart operations at its crippled San Onofre nuclear power plant, it will permanently shutdown both reactors there; 3) Duke Energy's cancellation of two proposed new atomic reactors at its Shearon Harris nuclear power plant in North Carolina; and 4) Florida's amendment to its previously highly permissive "advance cost recovery" or "Construction Work in Progress" law, via which ratepayers have been gouged to pay for proposed new reactors, when there is no guarantee the proposed new reactors will ever actually get built or generate electricity.

Peter Bradford also added the May 7th shutdown of Dominion's Kewaunee atomic reactor in WI -- despite the 20 years of operating license still left to it -- as another example of the "worst week since Fukushima" for the U.S. nuclear power industry.