As reported by the Boston Globe.
Holtec International has also proposed "temporarily storing" a grand total of 173,600 metric tons of commercial irradiated nuclear fuel at a site mid-way between Hobbs and Carlsbad, New Mexico.
The license tranfer from Entergy to Holtec at Pilgrim atomic reactor in Massachusetts, would include ownership, title, and liability for the irradiated nuclear fuel stored on-site.
Holtec's grand scheme is to ultimately transport Pilgrim's highly radioactive waste to its "consolidated interim storage facility" in NM.